Site Distribution
We design, install and maintain distribution systems to welfare accommodations and entire site temporary power supply.
Our distribution systems range from 32amps to 1000amps with all of our plant meeting BS 7375:2010 standards. We ensure that all plant is tested before being distributed, ensuring safety and quality. Zoning distribution MDUs are installed on-site and welfare accommodation to allow areas to be automatically isolated when not required, to reduce energy consumption and consequently reducing the client carbon footprint. A recent study demonstrates zoning to welfare accommodation can reduce energy consumption by approx. 50% - this may attribute to a substantial financial saving |